2017

Swift Energy achieved yet another success milestone in our newly develop RAPID project

Swift Energy achieved yet another success milestone in our newly develop RAPID project to deliver the following packages to various EPCC / customer Package 4 – 10 x IP41 Indoor Form 2 Distribution Board Package 12A – 3 x IP41 Indoor Form 3 Distribution Board Package 14 – 16 x IP41 Indoor Form 2 Distribution Board Package 14 …

Swift Energy achieved yet another success milestone in our newly develop RAPID project Read More »

Swift Energy with our project delivery partner receive a contract award from ENI Muara Balik Papan

Swift Energy with our project delivery partner receive a contract award from ENI Muara Balik Papan to construct and design on turnkey EPCC basis a zone 2 certified 32kW total installed solar power c/w 6 x 1695AH VRLA  battery system. The project is now under installation phase. The commissioning of the system is scheduled to be carried out …

Swift Energy with our project delivery partner receive a contract award from ENI Muara Balik Papan Read More »

Swift Solutions MSC will be exhibiting at the forthcoming PIPOC 2017

The MPOB International Palm Oil Congress and Exhibition (PIPOC) is a biennial event organised by the Malaysian Palm Oil Board (MPOB).It will once again be held at the Kuala Lumpur Convention Centre (KLCC) from 14-16 November 2017. The theme for PIPOC 2017, ‘Treasuring the Past, Charting the Future’, is timely with the commemoration of 100 …

Swift Solutions MSC will be exhibiting at the forthcoming PIPOC 2017 Read More »

Swift Energy is proud to supply our Distribution Boards to the world first FLNG Satu project

The Petronas Floating Liquefied Natural Gas (PFLNG) Satu, the Malaysian oil and gas company’s first FLNG facility, loaded its first cargo at the Kanowit gas field, offshore Miri, Sarawak on April 1, 2017. The first cargo was fully loaded onto the LNG carrier Seri Camellia which is expected to set sail for a South Asian …

Swift Energy is proud to supply our Distribution Boards to the world first FLNG Satu project Read More »

Request Technical Specification

By clicking the “Submit” button, you agree to Swift Energy’s privacy policy and conditions of use.