The award includes the supply of two sets of 4200KVA transformers, one set of 6300A cast resin busduct, two sets of NER (Neutral Earthing Resistor) for GTG (Gas Turbine Generator), one set of 400V LV (Low Voltage) Switchboard, along with the Integrated Monitoring and Control System (IMCS). The system will be delivered to the shipyard for installation in December 2021.