Swift Energy has completed successfully another EX equipment on turnkey basis for THHE to be installed at Shell Laila, Betty and D12 wellhead platform project involves LV AC Switchrack, 24vdc Switchrack, AC and DC Distribution Board, 400Vac/24vdc Battery Charger and Ex Battery Box with Nicd battery.